The planning key of the clean room
Release time:2013-10-17
Clean room whole plant planning, because of the wide-ranging, to construction, water and electricity, air conditioning, environmental protection and shock common planning, manufacturing, and other professionals, although a lot of clean room planning, much needed in the existing buildings, however, in order to avoid mistakes as possible in advance to confirm the following items:
1.Cleanliness level;
2.Balance of chamber pressure;
3.Temperature and humidity requirements;
4.The necessity of machine equipment;
5.Determine the production process;
6.Necessity of partial exhaust;
7.Future expansion of elasticity;
8.Adequate maintenance space;
9. Air conditioning mode;
10. Staff rest area arrangement;
11. Configuration of facilities and power;
12. Indoor clearance and floor load;
13. Equipment space and pipe room;
14. Few doors and Windows, better air tightness;
15. Static, vibration and noise;
16. Less handover of production line and activity line;
17. Public hazards, pollution and disaster prevention;
18. Measurement of installation and operation costs.